The environmental damage caused by the Horseshoe Solar Energy Project in Rush, New York, highlighting the lack of oversight in its operations.
• Activist Alexandra Fasulo claims that Horseshoe Solar has caused significant harm by puncturing an aquifer.
• The project has reportedly been approved with insufficient scrutiny, leading to potential permit abuse.
• As a result of the aquifer puncture, some residents are experiencing water shortages or contaminated water, and local farms have been flooded.
• There are concerns about vibrations affecting residents since the drilling incident.
• Local residents believe that the company, Invenergy, should be responsible for providing public water due to the damage done.
• The drilling also took place on sacred grounds of the Seneca Indian community.
• Activists warn that similar issues may arise nationwide if regulatory actions are not implemented.
The situation emphasizes the need for better oversight and accountability in renewable energy projects like Horseshoe Solar to prevent environmental and community damage.
https://www.independentsentinel.com/without-proper-oversight-horseshoe-solar-punctures-the-aquafer/
No comments:
Post a Comment